In March 2023, we upgraded the existing lighting in the hall of the Olympic swimming pool (Pristan swimming pool in Maribor) in a very important time with us in a record short time. Our common goal was to improve the level of illumination and at the same time raise the level of light uniformity above the water line.
Only 84 hours passed from the moment of approval of the technical solution to implementation, which is considered a great success.